Open canal works. It is necessary to construct a path for transporting water from the eastern source of the Mostakbal Misr project, with a capacity of 8 million m3 / y (Sector I)
Construction of the Toshka water canal (7 Kilometres). Earthworks, concrete works, seven intakes, bridge, lining, culverts, water reservoir and MEP (19 electromechanical gates).